01-Vertical screw conveyors- Vertical screw pump- Vertical screw conveyor design- Vertical screw conveyor calculations

A vertical screw conveyor conveys material upward in a vertical path. It requires less space than some other types of elevating conveyors. Vertical screw conveyor can handle most of the bulk materials provided there is no large lump. The maximum height is usually limited to 30m.

A vertical screw conveyor consists of a screw rotating in a vertical casing. The top bearing for the screw shaft must be designed to stand against radial and thrust loads. A suitable inlet port at the lower end and a discharge port at the upper end of the casing are provided. Feeding a vertical screw conveyor deserves careful consideration. Most materials are fed to the vertical conveyor by a straight or offset horizontal feeder conveyor. The ideal operation of a vertical screw conveyor is to have a controlled and uniform volume of material feeding.

Uneven feeding and start stop operation may adversely affect the performance of the vertical screw conveyor in terms of speed, capacity and horse power.

Average capacities and speeds of vertical conveyor

Nominal diameter of screw in mm Capacities in m3/hr Speed of screw
150 10 Up to 400 RPM
250 35 300 RPM
300 75 250 RPM
400 170 200 RPM

Vertical screw conveyors or some special design of vertical screw conveyor finds wide application in ship unloading.

01-Vertical screw lift- Vertical screw elevator- Vertical screw feeder- vertical screw conveyor-vertical screw pump

Practical experience with these conveyors has shown that the resistance factor for vertical conveyors is higher than those of the horizontal conveyors. Resistance factor λ may be taken as 5.5 to 7.5 for grains. 6.5 to 8.3 for salt.

01-screw conveyor design calculation- screw conveyor power calculation- screw conveyor efficiency- screw conveyor theory- screw conveyor formulae- screw conveyor flow rates

The driving power of the loaded screw conveyor is given by:

P = PH + PN + Pst

Where,

PH = Power necessary for the progress of the material

PN = Driving power of the screw conveyor at no load

Pst = Power requirement for the inclination of the conveyor

Power necessary for the progress of the material PH:

For a length L of the screw conveyor (feeder), the power PH in kilo watts is the product of the mass flow rate of the material by the length L and an artificial friction coefficient λ, also called the progress resistance coefficient.

PH = Im.L. λ.g / 3600 (kilowatt)

= Im.L. λ / 367 (kilowatt)

Where,

Im = Mass flow rate in t/hr

λ = Progress resistance coefficient

Each material has its own coefficient λ. It is generally of the order of 2 to 4. For materials like rock salt etc, the mean value of λ is 2.5. For gypsum, lumpy or dry fine clay, foundry sand, cement, ash, lime, large grain ordinary sand, the mean value of λ is 4.0.

In this connection it should be noted that the sliding of the material particles against each other gives rise to internal friction. Other resistance due to grading or shape of the output discharge pattern contributes to the resistance factor. That is why the parameter λ is always higher than that due to pure friction.

Drive power of the screw conveyor at no load, PN:

This power requirement is very low and is proportional to the nominal diameter and length of the screw.

PN = D.L / 20 (Kilowatt)

Where,

D = Nominal diameter of screw in meter

L = Length of screw conveyor in meter

Power due to inclination: Pst

This power requirement will be the product of the mass flow rate by the height H and the acceleration due to gravity g.

Pst = Im.H.g / 3600

= Im.H / 367

H should be taken positive for ascending screws and will be negative for descending screws.

Total power requirement:

The total power requirement is the sum total of the above items

P = (Im (λ.L + H) / 367) + (D.L /20) (Kilowatt)

Bumblebee

August 24, 2011

problem: two trains enter a tunnel 200 miles long (yeah, its a big tunnel) travelling at 100 mph at the same time from opposite directions. as soon as they enter the tunnel a supersonic bee flying at 1000 mph starts from one train and heads toward the other one. as soon as it reaches the other one it turns around and heads back toward the first, going back and forth between the trains until the trains collide in a fiery explosion in the middle of the tunnel (the bee survives). how far did the bee travel?

Solution

solution: this puzzle falls pretty high on my aha scale. my first inclination when i heard it was to think “ok, so i just need to sum up the distances that the bee travels…” but then you quickly realize that its a difficult (not impossible) summation which the interviewer could hardly expect you to answer (unless i guess if you are looking for a job as a quant). “there must be a trick” you say. eh, sort of i guess, enough to say that this question is a stupid interview question.

the tunnel is 200 miles long. the trains meet in the middle travelling at 100 mph, so it takes them an hour to reach the middle. the bee is travelling 1000 mph for an hour (since its flying the whole time the trains are racing toward one another) – so basically the bee goes 1000 miles.

there is no process to explain, so this question can’t possibly teach you anything about the person. they either know it or they don’t and if they already knew it before you asked, you’re not going to be able to tell when they give you the answer. so don’t ask this question. and if someone asks you this question, just tell them you’ve already heard it before.